Bill McGrath Reserve playground replacement

Share Bill McGrath Reserve playground replacement on Facebook Share Bill McGrath Reserve playground replacement on Twitter Share Bill McGrath Reserve playground replacement on Linkedin Email Bill McGrath Reserve playground replacement link

Installation of the new equipment and sand pit area will begin on Monday 1 July and the play space is expected to re-open to the public in 4–5 weeks. The nature play area will remain open. View the final design in the Document Library.

Read the project update below to find out the latest news about the playground replacement.

The playground at Bill McGrath Reserve in Kensington is due for replacement, as guided by the City’s Play Space Plan 2022 (PDF, 6.87 MB). To help us choose the new playground equipment, we’d like to know more about the types of play elements you love and the features you’d like to see there.

If you and your family visit Bill McGrath Reserve playground or you live nearby, complete the survey below and tell us what you think.

Get involved

The survey closed at 4pm, Monday 2 October 2023.

Information and documents on this page are available in alternative formats upon request.

Installation of the new equipment and sand pit area will begin on Monday 1 July and the play space is expected to re-open to the public in 4–5 weeks. The nature play area will remain open. View the final design in the Document Library.

Read the project update below to find out the latest news about the playground replacement.

The playground at Bill McGrath Reserve in Kensington is due for replacement, as guided by the City’s Play Space Plan 2022 (PDF, 6.87 MB). To help us choose the new playground equipment, we’d like to know more about the types of play elements you love and the features you’d like to see there.

If you and your family visit Bill McGrath Reserve playground or you live nearby, complete the survey below and tell us what you think.

Get involved

The survey closed at 4pm, Monday 2 October 2023.

Information and documents on this page are available in alternative formats upon request.

  • Bill McGrath Reserve play space installation

    Share Bill McGrath Reserve play space installation on Facebook Share Bill McGrath Reserve play space installation on Twitter Share Bill McGrath Reserve play space installation on Linkedin Email Bill McGrath Reserve play space installation link

    A new play space is being installed at Bill McGrath Reserve in Kensington, designed to offer local families an exciting array of play equipment for all ages.

    Offering plenty of fun and functionality, the new play space will include:

    • Larger play equipment
    • New sand pit
    • Stepping stones
    • A new shade shelter
    • Two tube slides
    • Rock climbing wall
    • A double swing


    The existing pencil climbers have been removed and replaced with new structures and the timber stepping boxes are already undergoing repair.

    Installation of the equipment and sand pit area will begin on Monday 1 July and is expected to re-open to the public in 4–5 weeks. The nature play area will remain open.

    Thank you to everyone from the community who provided feedback to the City.

  • Update - 18 October 2023

    Share Update - 18 October 2023 on Facebook Share Update - 18 October 2023 on Twitter Share Update - 18 October 2023 on Linkedin Email Update - 18 October 2023 link

    We received a good response to the Bill McGrath Reserve playground replacement survey and drop-in session, with a broad and diverse range of feedback.

    The top three favourite things to do at the playground were swinging, climbing and sliding, which is a common theme with other recent playground engagements. The pencils and steps in the nature area are extremely popular and will be retained, as will the basketball/netball court.

    The concept design for the new playground will be developed based on the feedback received, the City’s Play Space Plan, industry guidelines, and other considerations such as budget.

    A supplier will be engaged in the near future and it is anticipated that the new playground will be installed around April-June 2024 to allow for procurement, manufacture and delivery of the equipment.

    Sign up for email updates to stay in the loop.

Page last updated: 21 Oct 2024, 01:30 PM